underream | Energy Glossary

Explore the Energy Glossary

Look up terms beginning with:

underream

1. vb. []

To enlarge a wellbore past its original drilled size. Underreaming is sometimes done for safety or efficiency reasons. Some well planners believe it is safer to drill unknown shallow formations with a small-diameter bit, and if no gas is encountered, to then enlarge the pilot hole. An underreaming operation may also be done if a small additional amount of annular space is desired, as might be the case in running a liner if surge pressures were problematic.

See: bicenter bitlinerream