1. vb. []
To initiate flow from a reservoir by removing the column of kill fluid from the wellbore. Several methods of unloading the well are used, including circulation of lower density fluid, nitrogen lifting and swabbing. The method used will depend on the completion design, reservoir characteristics and local availability.
See related terms: nitrogen kickoff