The total time required for pumping the cementslurry into the well, plus a safety factor. Pumping time can also be the time required to reach a consistency deemed to be unpumpable (generally 70 Bc) during an API thickening-time test.
Share
Sign In to Access Premium Content
To download this file you first sign in to your Schlumberger account.
Don't have an account? Click below to get started.